Built specifically for CPWD, State PWD, and NHAI contractors. Manage digital measurement books, CPWD Form 26 Running Account bills, statutory deductions, and Clause 5 delay defense registers with bank-grade audit integrity.
CPWD Works Manual Compliant • IS 1200 Standards • Direct Tally Prime XML Export
Engineered to match the operational and audit requirements of Indian public works departments, highway authorities, and infrastructure EPCs.
Record field measurements by Km chainage with length, breadth, and depth calculations under IS 1200. Automatically calculate positive additions and deduction items for openings, recesses, and plinths. Includes Fe-550D TMT Bar Bending Schedule (BBS) generating total Metric Tons from cutting lengths, plus Level Book collimation checks.
Generate cumulative work executed ledgers with prior bill deductions and current net payable calculations. Fully automated Account III statutory deductions schedule: 5% Security Deposit/Retention, 2% Income Tax TDS u/s 194C, 2% GST-TDS (1% CGST + 1% SGST), and 1% BOCW Labour Welfare Cess.
Import tender schedules directly from Excel or scanned allotment orders. Perform detailed item rate analyses, reconcile Technical Sanction approvals, and monitor statutory variation thresholds (+/- 10% and +/- 25%) to prevent unauthorized overruns before measurement certification.
Maintain contemporaneous hindrance records with automatic statutory 14-day notice countdowns to protect your Extension of Time (EOT) rights under Clause 5 GCC. Monitor Bank Guarantees, FDRs, and Additional Performance Securities (APS) with 30-day proactive expiry alerts to protect cash flow.
PillarPro calculates every Running Account bill strictly per Indian statutory rules and the CPWD Works Manual to prevent audit inquiries and recovery discrepancies.
| Statutory Code | Deduction Head | Prescribed Rate | Statutory Rule & Release Condition | Billing Treatment |
|---|---|---|---|---|
| Clause 1A / SD | Security Deposit / Retention Money | 5.00% of Gross Value | Withheld per RA Bill until completion + Defect Liability Period (DLP) | Passed via Account III deduction |
| IT Sec. 194C | Income Tax TDS | 2.00% (Company / Firm) or 1.00% (Individual) | Deducted at source from contractor gross earnings | Credited directly against contractor PAN on Form 26AS / AIS |
| GST Sec. 51 | GST-TDS (1% CGST + 1% SGST) | 2.00% of Net Taxable Supply | Applicable for government works contract awards exceeding ₹2.50 Lacs | Auto-verified with GSTR-7 return filing credit |
| BOCW Cess Act | Labour Welfare Cess (1996 Act) | 1.00% of Construction Cost | Mandatory statutory cess collected on cost of construction | Remitted directly to State Building & Other Construction Workers Board |
Join civil contractors and highway EPCs running verified e-MBs, zero-drift Form 26 pass orders, and clean statutory audit dossiers.
7-Day Free Trial • No Credit Card Required • Export to Tally Prime